13 July 2009

bike job

BIKE JOB: WHAT I PLANNED

• Break chain, release rear derailleur, remove brakes, pedals, shifters, crankset, cogs (keep in tub @BRW).
• Strip bike of paint: "Circa 1850" Heavy Body paint & varnish remover (spray & gel).
• Clear-coat or otherwise seal frame with lube/grease to keep rust out.
• Re-install fork/headset/crankset/handlebars.
• Re-install brakes.
• Assemble wheelset, including tubes & tires. (Does it come with lockring/cog?) (No.)
• Remove extra chain links.
• Roll.



BIKE JOB: WHAT I DID

20090604, BRW:
Remove all parts (brakes, wheels, handlebars, crankset, sprockets, chainrings).
Strip paint on fork, begin stripping paint on frame.
Break chain, remove chain & rear derailleur


20090617, BRW
Keep stripping paint. (Halfway done.)
Buy lockring & cog.

20090625, BRW:
Keep stripping paint. (DONE!)

20090711, BRW:
Polish, finish up final paint strip.
Re-thread bottom bracket.
Clean & re-pack bottom bracket, headset.
Replace spindle.

Remove smaller chainring.
· 46/15t may be too gnarly a gear ratio. Kwan (BRW) suggests using smaller chainring & machining down larger chaining, turning it into a chainguard.
Install lockring & cog.
Install crankset.

200907__, BRW:
Patch busted tube.
Install brakes.
Swap out pedal straps, dark brown leather for black nylon.

2009____, Ongoing
Research saddles, bartape, toestraps (dark brown leather).

No comments: