BIKE JOB: WHAT I PLANNED
• Break chain, release rear derailleur, remove brakes, pedals, shifters, crankset, cogs (keep in tub @BRW).
• Strip bike of paint: "Circa 1850" Heavy Body paint & varnish remover (spray & gel).
• Re-install fork/headset/crankset/handlebars.
• Re-install brakes.
• Assemble wheelset, including tubes & tires. (Does it come with lockring/cog?) (No.)
• Remove extra chain links.
• Roll.
BIKE JOB: WHAT I DID
20090604, BRW:Remove all parts (brakes, wheels, handlebars, crankset, sprockets, chainrings).
Strip paint on fork, begin stripping paint on frame.
Break chain, remove chain & rear derailleur
20090617, BRWKeep stripping paint. (Halfway done.)Buy lockring & cog.
20090625, BRW:Keep stripping paint. (DONE!)
20090711, BRW:Polish, finish up final paint strip.Re-thread bottom bracket.
Clean & re-pack bottom bracket, headset.
Replace spindle.
Remove smaller chainring.
· 46/15t may be too gnarly a gear ratio. Kwan (BRW) suggests using smaller chainring & machining down larger chaining, turning it into a chainguard.Install lockring & cog.Install crankset.
200907__, BRW:
Patch busted tube.
Install brakes.
Swap out pedal straps, dark brown leather for black nylon.
2009____, Ongoing
Research saddles, bartape, toestraps (dark brown leather).
13 July 2009
bike job
Posted by Katie O'Shea Tags bikebuild, bikerowave, bikes, puch at 6:30 AM
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment