BIKE JOB: WHAT I PLANNED
• Break chain, release rear derailleur, remove brakes, pedals, shifters, crankset, cogs (keep in tub @BRW).
• Strip bike of paint: "Circa 1850" Heavy Body paint & varnish remover (spray & gel).
• Re-install fork/headset/crankset/handlebars.
• Re-install brakes.
• Assemble wheelset, including tubes & tires. (Does it come with lockring/cog?) (No.)
• Remove extra chain links.
• Roll.
BIKE JOB: WHAT I DID
20090604, BRW:Remove all parts (brakes, wheels, handlebars, crankset, sprockets, chainrings).
Strip paint on fork, begin stripping paint on frame.
Break chain, remove chain & rear derailleur
20090617, BRWKeep stripping paint. (Halfway done.)Buy lockring & cog.
20090625, BRW:Keep stripping paint. (DONE!)
20090711, BRW:Polish, finish up final paint strip.Re-thread bottom bracket.
Clean & re-pack bottom bracket, headset.
Replace spindle.
Remove smaller chainring.
· 46/15t may be too gnarly a gear ratio. Kwan (BRW) suggests using smaller chainring & machining down larger chaining, turning it into a chainguard.Install lockring & cog.Install crankset.
200907__, BRW:
Patch busted tube.
Install brakes.
Swap out pedal straps, dark brown leather for black nylon.
2009____, Ongoing
Research saddles, bartape, toestraps (dark brown leather).
Showing posts with label bikebuild. Show all posts
Showing posts with label bikebuild. Show all posts
13 July 2009
bike job
Posted by
Katie O'Shea
Tags
bikebuild,
bikerowave,
bikes,
puch
at
6:30 AM
0
comments
Subscribe to:
Posts (Atom)
